Thursday, September 20, 2012

September 20 Day 9 of Construction

The Challenge of clean Spring Water.

This spring did not always provide clean water and tragically as a result two People from the Primary School died of infections from the water. Since then a water filtration system has been installed and clorine is added every day. The spring now provides clean water for  the shisasari region of 7000 People.

 
Secondary School Project Day 9
All of the work around the outside walls is being done on Scaffolding. Hopefully all the outside walls will be completed by tomorrow afternoon. This work is slow as every brick on the 3 top levels needs to be sealed with Tile adhesive.

 



 
 
 
Trusses are now starting to be prepared for the Roof
 
The day ends with dinner at the Golf Hotel in Kakamega.
 
 
 
 

                                          Some of the Team at Dinner Kakamega Golf Hotel


No comments:

Post a Comment